Technical Report 3 is intended to provide information on areas of the project that are good candidates for research, alternative methods, value engineering, and schedule compression. Included is a detailed review of each session of this year’s PACE roundtable and a critical industry issue I wish to pursue through further research. Also included are problematic features of Geisinger Gray’s Woods Ambulatory Care Campus, analysis activities with research methods, and a detailed weight matrix for all proposed analyses.
Technical Report 3 (pdf)
|